Architectural Design & Off-Site Documentation โ€” a 4x2 home taken from planning through to build permit, with a coordinated documentation package that let the builder move fast.

Design Off-Site
Mount Claremont architectural project
About This Project

This 4x2 home includes all documentation from planning through to build permit โ€” structural, energy, design certification, architectural construction drawings and off-site shop drawings, all completed within six months. That documentation programme allowed the builder to hit the ground running the moment the build permit was granted, and the build itself was complete in just 18 weeks. This result could not have been achieved without the off-site documentation and programme prepared alongside the design.

6Months for full documentation โ€” planning to build permit
18Weeks to complete the build on site
4x2Bedroom, bathroom configuration